APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
PLTU Nagan Raya is a steam power plant with 2 x 110 MW installed capacity located in Aceh. As the biggest power plant in Aceh, PLTU Nagan Raya also have important role in Sumatera Utara electricity system. Recently, within derating condition, PLTU Nagan Raya requires improvement to maintain its...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/44173 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |