APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)

PLTU Nagan Raya is a steam power plant with 2 x 110 MW installed capacity located in Aceh. As the biggest power plant in Aceh, PLTU Nagan Raya also have important role in Sumatera Utara electricity system. Recently, within derating condition, PLTU Nagan Raya requires improvement to maintain its...

Full description

Saved in:
Bibliographic Details
Main Author: Dwi Prabowo, Yulianto
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/44173
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items