BOILER INSPECTION PLANNING CFB THERMAL POWER PLANT BASED ON CONDITION PERFORMANCE OF BOILER CASE STUDY PULANG PISAU THERMAL POWER PLANT ii 2X60 MW
Planning boiler inspections especially for the CFB type power plant currently does not have a standard standard. The advantage of this study is to provide a new alternative to inspection planning with reference to boiler performance conditions. The method is done by collecting boiler performanc...
Saved in:
Main Author: | Subekti Muslim Saputra, Ahmad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/44275 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BOILER INSPECTION PLANNING CFB THERMAL POWER PLANT BASED ON CONDITION PERFORMANCE OF BOILER CASE STUDY PULANG PISAU THERMAL POWER PLANT 2X60 MW
by: Subekti Muslim Saputra, Ahmad -
BOILER INSPECTION PLANNING CFB THERMAL POWER PLANT BASED ON CONDITION PERFORMANCE OF BOILER CASE STUDY PULANG PISAU THERMAL POWER PLANT ii 2X60 MW
by: Subekti Muslim Saputra, Ahmad -
INNOVATIVE METHOD FOR BOILER PERFORMANCE ENHANCEMENT AND NOX REDUCTION FOR SMALL-SCALE (0.58 MW) AND LARGE-SCALE (660 MW) BOILERS
by: XU MINGCHEN
Published: (2021) -
DESIGNING, MANUFACTURING, AND TESTING OF THE BOILER PERFORMANCE ON ELECTRICAL POWER PLANT 1,5 KW.
by: Haq, Nashirul -
STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
by: RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY