SOCIAL IMPACT ASSESSMENT TOWARD THE ANGKOT OPERATORS THAT INTERSECT IN DEVELOPMENT OF BUS RAPID TRANSIT SYSTEM (CASE STUDY: TRANS METRO BANDUNG)
This recent decades Indonesia keep commit to develop its BRT as mass transportation system . Unfortunately, the system itself got rejection respons from angkot operator in Bandung. Until, this system get delayed as a concequence of the owner and drivers who against its system. This social conflic...
Saved in:
Main Author: | Maris, Nico |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/44599 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EFFECTS OF LEFT TURNERS ON SATURATION FLOWS AT A SIGNALIZED INTERSECTION IN BANDUNG
by: KUSMAYADI, DAVEY -
THE DEVELOPMENT OF BEHAVIORAL INTENTION MODEL FOR USING PUBLIC TRANSPORTATION ON TRANS METRO PEKANBARU PASSENGERS
by: Soraya Faiza Nasution, Siti -
PURABAYA SURABAYA BUS TERMINAL
by: Ridho Kharisma Putra, M -
Air Suspension Design In Articulated Bus
by: Robin -
LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
by: Bima Arrahman, Muhammad