STUDI PENINGKATAN EFISIENSI PENGOPERASIAN TURBIN GAS PEMBANGKIT LISTRIK PT CPI
<b></i>Abstract :</b><i><p align=\"justify\"> <br /> PT CPI is currently operating 21 units of Gas Turbine Generator to generate electric power required for its operation in exploring and producing crude oil. Current gas turbine generator operation prac...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/4648 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |