STUDI PENINGKATAN EFISIENSI PENGOPERASIAN TURBIN GAS PEMBANGKIT LISTRIK PT CPI

<b></i>Abstract :</b><i><p align=\"justify\"> <br /> PT CPI is currently operating 21 units of Gas Turbine Generator to generate electric power required for its operation in exploring and producing crude oil. Current gas turbine generator operation prac...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM 28196033), AZHAR
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/4648
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first