STUDI PENINGKATAN EFISIENSI PENGOPERASIAN TURBIN GAS PEMBANGKIT LISTRIK PT CPI
<b></i>Abstract :</b><i><p align=\"justify\"> <br /> PT CPI is currently operating 21 units of Gas Turbine Generator to generate electric power required for its operation in exploring and producing crude oil. Current gas turbine generator operation prac...
Saved in:
Main Author: | (NIM 28196033), AZHAR |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/4648 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUASI PENGOPERASIAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO WANGAN AJI, WONOSOBO
by: , Heru Nugroho, et al.
Published: (2013) -
PENGEMBANGAN PROGRAM PERHITUNGAN EFISIENSI PEMBANGKIT LISTRIK TENAGA GAS DENGAN PENGGABUNGAN SIKLUS
by: , FRANS IMANUEL GULTOM, et al.
Published: (2014) -
EFISIENSI PEMBANGKIT LISTRIK: STUDI KASUS UNIT PEMBANGKITAN PAITON
by: LAILIA RAHMAWATI, 041411131111
Published: (2018) -
Rancang bangun turbin helikal untuk pembangkit listrik tenaga mikrohidro (PLTMH)
by: , FAKHRUDDIN, et al.
Published: (2009) -
"Model turbin air gorlov sebagai sistem pembangkit listrik tenaga mikrohidro"
by: , SALEH, Zulkiffli, et al.
Published: (2010)