ECONOMIC FEASIBILITY STUDY BIOGAS POWER PLANT INTERCONNECTION PT ANEKA BISNIS SAWIT IN CENTRAL KALIMANTAN
Along with increasing palm oil production in Indonesia, the residual waste from processing results increases as well. For the years, utilization of Palm Oil Mill Effluent (POME) has only become fertilizer. Besides that, there are other potential benefits such as renewable energy, carbon reduction to...
Saved in:
Main Author: | Rifai Septiansyah, Bahtiar |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46969 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FINANCIAL FEASIBILITY OF PASIR MANDOGE BIOGAS POWER PLANT (PLTBG) PROJECT
by: Andikarama Hamdani, Dandy -
Conceptual Design of Centralized Biogas Power Plant, Case Study Bantul, Yogyakarta, Indonesia
by: Na'imah, Dintany Y.N., et al.
Published: (2014) -
ANALYSIS OF POWER SYSTEM STABILITY DURING THE INTERCONNECTION OF THE ELECTRICITY SYSTEMS OF WEST KALIMANTAN AND CENTRAL KALIMANTAN USING MODAL ANALYSIS
by: Iqra Orytuasikal, Mohamad -
DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE
(CASE STUDY IN BANTUL, INDONESIA)
by: , DINTANI Y N N, et al.
Published: (2013) -
The economic feasibility study of a 100-MW Power-to-Gas plant
by: Miao, Bin, et al.
Published: (2021)