REVERSE ENGINEERING OF 63 MW FRANCIS TURBINE GUIDE VANE GEOMETRY IN PLTA BAKARU
PLTA (Hydroelectric Power Plant) Bakaru is an electric power plant which utilizes Francis turbines in order to supply the average annual electricity demand of 1030 GWH within the area of South and West Sulawesi. These particular Francis turbines used are the products of Toshiba, a Japanese corpor...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/47399 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |