THE MAIN CAUSES OF PROJECT IMPLEMENTATION DELAY AT ONE OF INDONESIAâS STATE-OWNED BANK
For many banks in Indonesia, especially at one of the state-owned bank, effective project management has become potential source of competitive advantage that needs to embedded at the heart of the business. As the banking business is very dynamic and governed by regulator, the management has put a l...
Saved in:
Main Author: | Hasudungan Sibarani, Daniel |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/47638 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT ANALYSIS ON THE DEVELOPMENT OF FERRONICKEL SMELTER IN EAST HALMAHERA AS ONE OF INDONESIAâS NATIONAL STRATEGIC PROJECT
by: Ridwan Silaban, Daniel -
BANKING FACTORS OF NON-PERFORMING LOANS IN STATE-OWNED BANKS
by: Prawira, Renno -
PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIAâS PROJECT
by: Pranata Surbakti, Erwin -
ANALYSIS OF FACTORS CAUSING DELAYS IN IMPLEMENTATION OF THE HIGH RISE BUILDING CONSTRUCTION PROJECT AT PT. HUTAMA KARYA (PERSERO)
by: Bogo Yustanto, Kurniawan -
MAJOR DELAY CAUSES OF RESIDENTIAL PROJECTS IN THE YANGTZE DELTA OF CHINA
by: CHEN YUAN
Published: (2010)