SELECTION OF PRIORITY WATERSHEDS FOR UTILIZATION OF WATER RESOURCES USING FUZZY AHP â SIG METHOD
The Kamundan Sebyar river basin is a nationally strategic river basin consisting of 90 watersheds. The Kamundan Sebyar river basin has great potential in the water resources sector, but due to limited human and financial resources, it is deemed necessary to establish a priority order in its manageme...
Saved in:
Main Author: | Effendi, Imam |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50295 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ALTERNATIVE PRIORITY STUDY OF FLOOD CONTROL USING THE FUZZY LOGIC AND AHP METHODS (CASE STUDY: PANGKALPINANG CITY)
by: (NIM : 95016301), SAPRIZAL -
THE CONSTRUCTION OF ORDERS PRIORITY DECISION MODEL AT TAMBI PLANTATION UNIT USING AHP AND PROMETHEE METHOD
by: LAKSMIDEWI MUHARDI, TIARA -
Optimal selection of desalination systems using fuzzy AHP and grey relational analysis
by: Eusebio, Ramon C. P., et al.
Published: (2016) -
OPTIMIZING TRANSMISSION â OIL VENDOR SELECTION USING AHP AND FUZZY AHP METHODS: A CASE STUDY IN AIRCRAFT SERVICES â PT. DIRGANTARA INDONESIA
by: Fauzi Rachman, Adnan -
EVALUATION OF TREATMENT PRIORITIES IN KAIS FORMATION WITH THE AHP METHOD APPROACH TO INCREASING PRODUCTION AND EFFECTIVE OPERATIONS
by: Pri Irawan, Elbadi