PENYUSUNAN PROSEDUR UNTUK PRAKIRAAN BEBAN PERAWATAN NON-RUTIN DI MRO XYZ (STUDI KASUS: C-CHECK BOEING 737NG)
Maintenance, Repair, and Overhaul (MRO) need a high percentage of on-time Turnaround Time (TAT). In 2019, there is a 29% difference between the plan and the actual TAT in MRO XYZ. Based on the observation, there is no planning to do non-routine maintenance. 54% of the total maintenance is the non-ro...
Saved in:
Main Author: | Graciova, Dave |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50757 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
by: Martina, Ayu -
PERBAIKAN PROSES PERAWATAN PESAWAT UDARA DENGAN PRINSIP LEAN MAINTENANCE STUDI KASUS C-CHECK BOEING 737-800
by: Saputra, Dian -
METODE PENENTUAN PREMI PERAWATAN PESAWAT UDARA KASUS BOEING 737-300\/400\/500 DI GMF-AEROASIA
by: RAHADHYAN, MAHARDIKA -
A QUALITY COMPONENT OF AIRCRAFT MAINTENANCE USING MAINTENANCE PLANNING AND SCHEDULING PRINCIPLES. CASE STUDY C-CHECK BOEING 737-800
by: PRIMA GASTRIANI, OVI -
ANALISIS DATA KECELAKAAN DAN KEGAGALAN SISTEM RUDDER BOEING 737
by: KALUBIS RUSTANDI, WENDA