ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
PT XYZ is one of the air transportation companies in Indonesia that experienced delays in completing C-check maintenance based on a predetermined schedule. The TAT (Turn Around Time) indicator is used to measure the performance in completing the maintenance at PT XYZ. This research aims to determ...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66189 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |