ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)

PT XYZ is one of the air transportation companies in Indonesia that experienced delays in completing C-check maintenance based on a predetermined schedule. The TAT (Turn Around Time) indicator is used to measure the performance in completing the maintenance at PT XYZ. This research aims to determ...

Full description

Saved in:
Bibliographic Details
Main Author: Martina, Ayu
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/66189
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66189
spelling id-itb.:661892022-06-27T12:20:36ZANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ) Martina, Ayu Indonesia Theses Delay, C-check maintenance, Turn Around Time, B737NG INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66189 PT XYZ is one of the air transportation companies in Indonesia that experienced delays in completing C-check maintenance based on a predetermined schedule. The TAT (Turn Around Time) indicator is used to measure the performance in completing the maintenance at PT XYZ. This research aims to determine the factors that cause maintenance delays on the B737NG aircraft and minimize TAT delays. This research uses fishbone diagrams and Pareto diagrams to find the root causes. There are three main factors that cause the delays, namely due to lack of manpower, the process of waiting for material supply, and the length of time to process the findings. In order to strengthen the analysis, this research uses the Define Measure Analyze Improve Control (DMAIC) method with the support of FMEA to develop a table for the RPN values or risk priority scale. The calculation results show that the highest RPN value is not paying attention on the ratio of work to manpower, which gives an RPN value of 216. Then a solution is recommended to reduce the RPN value to become value 168 where the aim is to reduce the TAT delay in completing the C-check maintenance of PT XYZ’s Boeing 737NG aircraft. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT XYZ is one of the air transportation companies in Indonesia that experienced delays in completing C-check maintenance based on a predetermined schedule. The TAT (Turn Around Time) indicator is used to measure the performance in completing the maintenance at PT XYZ. This research aims to determine the factors that cause maintenance delays on the B737NG aircraft and minimize TAT delays. This research uses fishbone diagrams and Pareto diagrams to find the root causes. There are three main factors that cause the delays, namely due to lack of manpower, the process of waiting for material supply, and the length of time to process the findings. In order to strengthen the analysis, this research uses the Define Measure Analyze Improve Control (DMAIC) method with the support of FMEA to develop a table for the RPN values or risk priority scale. The calculation results show that the highest RPN value is not paying attention on the ratio of work to manpower, which gives an RPN value of 216. Then a solution is recommended to reduce the RPN value to become value 168 where the aim is to reduce the TAT delay in completing the C-check maintenance of PT XYZ’s Boeing 737NG aircraft.
format Theses
author Martina, Ayu
spellingShingle Martina, Ayu
ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
author_facet Martina, Ayu
author_sort Martina, Ayu
title ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
title_short ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
title_full ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
title_fullStr ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
title_full_unstemmed ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
title_sort analysis of delay in completing c-check (case study: maintenance on boeing 737ng at pt xyz)
url https://digilib.itb.ac.id/gdl/view/66189
_version_ 1822932967353221120