ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
PT XYZ is one of the air transportation companies in Indonesia that experienced delays in completing C-check maintenance based on a predetermined schedule. The TAT (Turn Around Time) indicator is used to measure the performance in completing the maintenance at PT XYZ. This research aims to determ...
Saved in:
Main Author: | Martina, Ayu |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66189 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A QUALITY COMPONENT OF AIRCRAFT MAINTENANCE USING MAINTENANCE PLANNING AND SCHEDULING PRINCIPLES. CASE STUDY C-CHECK BOEING 737-800
by: PRIMA GASTRIANI, OVI -
PENYUSUNAN PROSEDUR UNTUK PRAKIRAAN BEBAN PERAWATAN NON-RUTIN DI MRO XYZ (STUDI KASUS: C-CHECK BOEING 737NG)
by: Graciova, Dave -
PERBAIKAN PROSES PERAWATAN PESAWAT UDARA DENGAN PRINSIP LEAN MAINTENANCE STUDI KASUS C-CHECK BOEING 737-800
by: Saputra, Dian -
FORECASTING METHOD DEVELOPMENT FOR STANDARD MATERIAL PROVISION USED ON AIRCRAFT MAINTENANCE PACKAGE (STUDY CASE: B737NG AIRCRAFT C CHECK)
by: Jethro, Vincent -
ANALISIS DATA KECELAKAAN DAN KEGAGALAN SISTEM RUDDER BOEING 737
by: KALUBIS RUSTANDI, WENDA