PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY
Environmental and safety issues are very important in the world's upstream oil and gas business. Based on a higher awareness of stakeholders for environmental its issues will encourage oil and gas companies to pay more attention to the environment which will be more challenging and complex as...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51132 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:51132 |
---|---|
spelling |
id-itb.:511322020-09-27T07:47:41ZPROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY Sulthony, Bona Manajemen umum Indonesia Theses Kinerja Lingkungan, Air Terproduksi, Pengambilan Keputusan, Simple Multi Attribute Rating Technique, Value-Focus Thinking, Seleksi Alternatif. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51132 Environmental and safety issues are very important in the world's upstream oil and gas business. Based on a higher awareness of stakeholders for environmental its issues will encourage oil and gas companies to pay more attention to the environment which will be more challenging and complex as business continues. Environmental Stewardship, protecting people and the environment, is a Chevron Way value that guides an action to get results the right way, every time. The stakes are high, and tolerance is low for events that negatively impact people and the environment. PT Chevron Pacific Indonesia plays an important role in protecting the environment, achieving Operational Excellence objectives and in meeting environment focus area expectations. Chevron environmental principles take a life cycle approach to defining how Chevron provide energy in an environmentally responsible manner. For implementation, Chevron have guideline called Environmental Performance Standard (EPS) and one of its implementation guidelines is for upstream Produced Water disposal. The purpose of this final project is to select the best alternative solution for produced water disposal in Bangko Gathering Station to meet Chevron Environmental Performance Standard (EPS) on Produced Water guideline with fundamental objective is to reduce potential environmental impacts and liabilities exposure to the Chevron. This is genuinely implementing one of company value to protecting people and the environment and to maintain sustainability operation of Chevron. The decision-making process for selecting the best alternative in this project is formalized by using Simple Multi Attribute Rating Technique (SMART) in accordance with value and goal to be achieved and it is supported by Value-Focus Thinking (VFT) method to explore the business issue by exploring decision problem and decision opportunities that will help to generate alternatives and criteria. The qualitative analyses in this project are conducted through Focus Group Discussion involving all stakeholders from multi disciplines background which have knowledge on the facility. The proposed alternative in this study is the alternative 4 – Run All Spare Pumps & Procure 2 Spare Bare Pump and Motor. The result of this study is proposed to be a project and will be implemented using the concept of project management. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Sulthony, Bona PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY |
description |
Environmental and safety issues are very important in the world's upstream oil and gas business. Based on a
higher awareness of stakeholders for environmental its issues will encourage oil and gas companies to pay
more attention to the environment which will be more challenging and complex as business continues.
Environmental Stewardship, protecting people and the environment, is a Chevron Way value that guides an
action to get results the right way, every time. The stakes are high, and tolerance is low for events that
negatively impact people and the environment. PT Chevron Pacific Indonesia plays an important role in
protecting the environment, achieving Operational Excellence objectives and in meeting environment focus
area expectations. Chevron environmental principles take a life cycle approach to defining how Chevron
provide energy in an environmentally responsible manner. For implementation, Chevron have guideline
called Environmental Performance Standard (EPS) and one of its implementation guidelines is for upstream
Produced Water disposal.
The purpose of this final project is to select the best alternative solution for produced water disposal in
Bangko Gathering Station to meet Chevron Environmental Performance Standard (EPS) on Produced Water
guideline with fundamental objective is to reduce potential environmental impacts and liabilities exposure
to the Chevron. This is genuinely implementing one of company value to protecting people and the
environment and to maintain sustainability operation of Chevron.
The decision-making process for selecting the best alternative in this project is formalized by using Simple
Multi Attribute Rating Technique (SMART) in accordance with value and goal to be achieved and it is
supported by Value-Focus Thinking (VFT) method to explore the business issue by exploring decision
problem and decision opportunities that will help to generate alternatives and criteria. The qualitative
analyses in this project are conducted through Focus Group Discussion involving all stakeholders from multi
disciplines background which have knowledge on the facility.
The proposed alternative in this study is the alternative 4 – Run All Spare Pumps & Procure 2 Spare Bare
Pump and Motor. The result of this study is proposed to be a project and will be implemented using the
concept of project management. |
format |
Theses |
author |
Sulthony, Bona |
author_facet |
Sulthony, Bona |
author_sort |
Sulthony, Bona |
title |
PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY |
title_short |
PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY |
title_full |
PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY |
title_fullStr |
PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY |
title_full_unstemmed |
PROBLEM SOLVING AND DECISION MAKING OF BANGKO WATERFLOOD PROJECT TO ACHIEVE ZERO WATER DISCHARGE AS COMPLIANCE TO CHEVRON CORPORATE POLICY |
title_sort |
problem solving and decision making of bangko waterflood project to achieve zero water discharge as compliance to chevron corporate policy |
url |
https://digilib.itb.ac.id/gdl/view/51132 |
_version_ |
1822928648756264960 |