DESIGN OF CONSTRUCTION IMPLEMENTATION METHODS, SCHEDULING, AND ESTIMATION OF CONSTRUCTION COSTS PROJECT BALIKPAPAN FOOTBALL STADION PROJECT
Balikpapan City As the center of business and industry, this city has the largest economy in all of Kalimantan, with a total GDP of IDR 79.65 trillion in 2016 From a population perspective, Balikpapan is the second largest city in East Kalimantan (after Samarinda City) with a total population of...
Saved in:
Main Author: | Fadhli Mubarak, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51314 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
by: INDRI MEUTIA - NIM: 15014032 , RIZKA -
CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIK KEDIRI
by: Lim, Calvin -
CONSTRUCTION IMPLEMENTATION METHOD PLANNING, SCHEDULING AND CONSTRUCTION COST ESTIMATION FOR FLUID ARCHITECTURE BUILDING PROJECT AT CIBADAK, BANDUNG
by: Khumairah Marhenda, Nabilah -
CONSTRUCTION METHODS AND MANAGEMENT PLANNING OF PERSIBA FOOTBALL STADIUM IN BALIKPAPAN
by: SETIAWAN, DANIEL -
DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
by: YEODA - NIM: 15014033, DANIEL