COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH
Mining activities are is sequence of exploring, excavation, transporting, selling and post mining activities along with research on mineral and coal. One of the main activities carried out by PT Mifa Bersaudara is transporting coal from Pit to stockpile area or Coal Crushing Plan (CCP). In order to...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51441 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:51441 |
---|---|
spelling |
id-itb.:514412020-09-28T19:10:51ZCOMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH Gestroi Situmorang, Asbon Pertambangan dan operasi berkaitan Indonesia Final Project Productivity, Match Factor, Cycle Time, Loader, and Hauler INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51441 Mining activities are is sequence of exploring, excavation, transporting, selling and post mining activities along with research on mineral and coal. One of the main activities carried out by PT Mifa Bersaudara is transporting coal from Pit to stockpile area or Coal Crushing Plan (CCP). In order to know the fleet performance, therefore, a study related to the compatibility betweeen loader and hauler, which is determining the match factor of loader and hauler for each fleet and ideal number of loader and hauler is carried out. The data that used in this study are cycle time of loader and hauler that obtained by direct observation at PT Mifa Bersaudara’s Pit, loader specification, hauler specification, the number of loader and hauler. The results of this study are as follows : a) actual productivity of fleet no 4023, 3172, 3173, 3201 are 309 ton/hour, 186 ton/hour, 190 ton/hour, 198 ton/hour, in respectively; b) actual match factor of fleet no 4023, 3172, 3173, 3201 are 0,65, 0,78, 0,76, 0,81, in respectively; c) the actual mining equipment (hauler of 18 units are combined together with 4 units of loader) is quite enough to fulfil the daily production target, however, 1 unit dozer ripper as supporting unit must be provided at mining front . text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Pertambangan dan operasi berkaitan |
spellingShingle |
Pertambangan dan operasi berkaitan Gestroi Situmorang, Asbon COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH |
description |
Mining activities are is sequence of exploring, excavation, transporting, selling and post mining activities along with research on mineral and coal. One of the main activities carried out by PT Mifa Bersaudara is transporting coal from Pit to stockpile area or Coal Crushing Plan (CCP). In order to know the fleet performance, therefore, a study related to the compatibility betweeen loader and hauler, which is determining the match factor of loader and hauler for each fleet and ideal number of loader and hauler is carried out.
The data that used in this study are cycle time of loader and hauler that obtained by direct observation at PT Mifa Bersaudara’s Pit, loader specification, hauler specification, the number of loader and hauler. The results of this study are as follows : a) actual productivity of fleet no 4023, 3172, 3173, 3201 are 309 ton/hour, 186 ton/hour, 190 ton/hour, 198 ton/hour, in respectively; b) actual match factor of fleet no 4023, 3172, 3173, 3201 are 0,65, 0,78, 0,76, 0,81, in respectively; c) the actual mining equipment (hauler of 18 units are combined together with 4 units of loader) is quite enough to fulfil the daily production target, however, 1 unit dozer ripper as supporting unit must be provided at mining front . |
format |
Final Project |
author |
Gestroi Situmorang, Asbon |
author_facet |
Gestroi Situmorang, Asbon |
author_sort |
Gestroi Situmorang, Asbon |
title |
COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH |
title_short |
COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH |
title_full |
COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH |
title_fullStr |
COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH |
title_full_unstemmed |
COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH |
title_sort |
compatibility between loader and hauler at pt mifa bersaudara, meulaboh, west aceh |
url |
https://digilib.itb.ac.id/gdl/view/51441 |
_version_ |
1822928745276637184 |