COMPATIBILITY BETWEEN LOADER AND HAULER AT PT MIFA BERSAUDARA, MEULABOH, WEST ACEH
Mining activities are is sequence of exploring, excavation, transporting, selling and post mining activities along with research on mineral and coal. One of the main activities carried out by PT Mifa Bersaudara is transporting coal from Pit to stockpile area or Coal Crushing Plan (CCP). In order to...
Saved in:
Main Author: | Gestroi Situmorang, Asbon |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51441 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF UNDERGROUND STABILITY ON WEAK ROCK MASSES TUNNEL 3 SIGLI-BANDA ACEH
by: Bakuh Lumaksono, Fajar -
ANALYSIS OF TUNNEL STABILITY ON SOFT ROCKS IN TUNNEL 3 SECTION 1 SIGLI â BANDA ACEH TOLL ROAD
by: Alamsyah, Syamsi -
CCUS HUB OPTIMIZATION MODEL ANALYSIS IN WEST PAPUA
by: Febriani, Amanda -
PEMODELAN MV TYPE SWAB CUP PACKER SEBAGAI VALVE SATU ARAH
by: B.M. Situmorang, Willy -
SHUTDOWN PLANNING ON WEST NATUNA TRANSPORTATION SYSTEM (WNTS) OFFSHORE PIPELINE NETWORK BY THE LINEPACK
by: Giovanni, Irsyad