LONGWALL MINING DESIGN WITH TWO-ENTRY SYSTEM AND THREE-ENTRY SYSTEM FOR MAIN ENTRY AND COAL PRODUCTION ESTIMATION
Indonesia has 124.6 billion ton coal resources according to the Ministry of Energy and Mineral Resources (2018). Coal mining system can apply an open pit mining system or an underground mining system. One of the most commonly used underground mining systems for coal is Longwall. Therefore, it is...
Saved in:
Main Author: | Maulidya, Astried |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51449 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ECONOMIC VALUATION ON LONGWALL COAL MINING PROJECT OF PT. XYZ USING REAL OPTION METHOD
by: Chandra Bahari, Ekiko -
PREDICTION OF LAND SUBSIDENCE DUE TO PT. XYZ LONGWALL COAL MINING PANEL USING EMPIRICAL METHOD AND NUMERICAL METHOD
by: Agustinus Rambe, Herman -
CHARACTERIZATION AND EFFECTIVITY STUDY FOR RAIN GAUGE IN COAL MINE AREA
by: Fahira, Nur -
STUDY ON AREA RAINFALL CALCULATION METHOD IN A COAL MINE
by: Prasetya Putra, Gigih -
PIT WALL LEACHING TEST AND PREDICTION WATER QUALITY OF PIT LAKE IN MINE CLOSURE IN COAL MINE
by: Zanno, Mochammad