DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE

West Java Province is one of the provinces with the largest manufacturing sector. According to Keputusan Menteri Perhubungan No.87 of 2017 concerning the Patimban Port Master Plan, the manufacturing sector has even become the sector with the highest contribution to the gross regional domestic produc...

Full description

Saved in:
Bibliographic Details
Main Author: Fajri Raazaq Ramadhan, Mohammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/51626
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51626
spelling id-itb.:516262020-09-29T16:31:43ZDESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE Fajri Raazaq Ramadhan, Mohammad Indonesia Final Project Berth, Structure, Container, Modellin INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51626 West Java Province is one of the provinces with the largest manufacturing sector. According to Keputusan Menteri Perhubungan No.87 of 2017 concerning the Patimban Port Master Plan, the manufacturing sector has even become the sector with the highest contribution to the gross regional domestic product of West Java Province, reaching up to 43,03%. With the large manufacturing sector in West Java, 70% of domestic cargo is produced on the island of Java, with one of its centers in West Java. However, the amount of cargo produced is not comparable to existing facilities because West Java still relies on Tanjung Priok Port as the main port for the distribution of goods by sea. In addition, the use of Tanjung Priok Port also increases accommodation costs due to the high level of congestion around Tanjung Priok Port, thus increasing costs that should be trimmed.Consider to these, facilities were built that could accommodate cargo distribution activities by sea, a port with one of the main components in the form of a berth structure. One of the berth structures built at Patimban Port is a berth structure for a container terminal built in the north of Subang Regency.In this Final Project regarding the Design of Container Terminal Port Structures Phase 1-1 Patimban Port, discussed the design of the berth structure based on the design criteria used as a requirement for designing the berth structure. The design of the berth structure includes the collection and processing of secondary data, the calculation of the dimensions of the berth structure and the structural elements of the berth, the modeling of the berth structure, the design of the reinforcement of the structural elements of the berth, and the analysis of the bearing capacity of the soil.In this final project, the results of secondary data collection and processing are used to obtain the initial dimensions of the berth structure and the structural elements of the berth. The initial dimensions of the structure and the structural elements of the berth are then used for modeling using SAP2000 software to determine the reliability of the structure against working loads. The modeling results are in the form of unity check ratio, structural deflection, internal force, and placement reaction. Internal force is used for reinforcement and the laying reaction is used for soil bearing capacity analysis.The final result of this final project is a design of the dimensions of the structure and structural elements of the berth, details of reinforcement, and depth of the piling plan. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description West Java Province is one of the provinces with the largest manufacturing sector. According to Keputusan Menteri Perhubungan No.87 of 2017 concerning the Patimban Port Master Plan, the manufacturing sector has even become the sector with the highest contribution to the gross regional domestic product of West Java Province, reaching up to 43,03%. With the large manufacturing sector in West Java, 70% of domestic cargo is produced on the island of Java, with one of its centers in West Java. However, the amount of cargo produced is not comparable to existing facilities because West Java still relies on Tanjung Priok Port as the main port for the distribution of goods by sea. In addition, the use of Tanjung Priok Port also increases accommodation costs due to the high level of congestion around Tanjung Priok Port, thus increasing costs that should be trimmed.Consider to these, facilities were built that could accommodate cargo distribution activities by sea, a port with one of the main components in the form of a berth structure. One of the berth structures built at Patimban Port is a berth structure for a container terminal built in the north of Subang Regency.In this Final Project regarding the Design of Container Terminal Port Structures Phase 1-1 Patimban Port, discussed the design of the berth structure based on the design criteria used as a requirement for designing the berth structure. The design of the berth structure includes the collection and processing of secondary data, the calculation of the dimensions of the berth structure and the structural elements of the berth, the modeling of the berth structure, the design of the reinforcement of the structural elements of the berth, and the analysis of the bearing capacity of the soil.In this final project, the results of secondary data collection and processing are used to obtain the initial dimensions of the berth structure and the structural elements of the berth. The initial dimensions of the structure and the structural elements of the berth are then used for modeling using SAP2000 software to determine the reliability of the structure against working loads. The modeling results are in the form of unity check ratio, structural deflection, internal force, and placement reaction. Internal force is used for reinforcement and the laying reaction is used for soil bearing capacity analysis.The final result of this final project is a design of the dimensions of the structure and structural elements of the berth, details of reinforcement, and depth of the piling plan.
format Final Project
author Fajri Raazaq Ramadhan, Mohammad
spellingShingle Fajri Raazaq Ramadhan, Mohammad
DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
author_facet Fajri Raazaq Ramadhan, Mohammad
author_sort Fajri Raazaq Ramadhan, Mohammad
title DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
title_short DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
title_full DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
title_fullStr DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
title_full_unstemmed DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
title_sort design structure container berth phase 1-1 port of patimban, subang regency, west java province
url https://digilib.itb.ac.id/gdl/view/51626
_version_ 1822928798197219328