DESIGN STRUCTURE CONTAINER BERTH PHASE 1-1 PORT OF PATIMBAN, SUBANG REGENCY, WEST JAVA PROVINCE
West Java Province is one of the provinces with the largest manufacturing sector. According to Keputusan Menteri Perhubungan No.87 of 2017 concerning the Patimban Port Master Plan, the manufacturing sector has even become the sector with the highest contribution to the gross regional domestic produc...
Saved in:
Main Author: | Fajri Raazaq Ramadhan, Mohammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51626 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STRUCTURAL DESIGN OF CONTAINER BERTH NO. 2 STAGE 1 PHASE 2 AT PORT OF PATIMBAN, SUBANG, WEST JAVA
by: Herfrison, Aditya -
PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
by: Alviandi (15514060), Senna -
IMPLEMENTATION OF GREEN PORT CONCEPT (CASE STUDY: PATIMBAN PORT, SUBANG REGENCY, WEST JAVA PROVINCE)
by: Perwitasari, Dyah -
FINANCIAL FEASIBILITY STUDY PATIMBAN PORT PHASE 1, SUBANG, WEST JAVA
by: Novareta - Nim: 15514004 , Novila -
CONSTRUCTION MANAGEMENT OF RECLAMATION AND DREDGING PHASE 1 PATIMBAN PORT, SUBANG, WEST JAVA
by: Andrianto (NIM : 15513008), Richard