ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE

PT. SINOHYDRO together with PT. Kereta Cepat Indonesia Cina (KCIC) is currently working on the Jakarta-Bandung fast train tunnel construction project. One of the tunnels currently being worked on is tunnel # 4 in Sukatani District, Purwakarta Regency. Tunnel # 4 is planned to use mechanical excav...

Full description

Saved in:
Bibliographic Details
Main Author: Pratama, Rengga
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51665
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51665
spelling id-itb.:516652020-09-29T21:33:39ZANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE Pratama, Rengga Pertambangan dan operasi berkaitan Indonesia Final Project Scaled Distance (SD) , Peak Vector Sum (PVS), Peak Particle Acceleration (PPA), Peak Particle Displacement (PPD). INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51665 PT. SINOHYDRO together with PT. Kereta Cepat Indonesia Cina (KCIC) is currently working on the Jakarta-Bandung fast train tunnel construction project. One of the tunnels currently being worked on is tunnel # 4 in Sukatani District, Purwakarta Regency. Tunnel # 4 is planned to use mechanical excavation for soft materials in the form of silty clay and silty sand and blasting methods for hard materials in the form of andesite rock. This research was conducted with the aim of predicting the amount of PVS, PPA, and PPD as a result of the blasting in the vicinity of tunnel # 4 KCIC. Data was collected directly in the field using the Instantel "Minimate Plus" tool. Data processing was processed using the Blastware application and Microsoft Excel. The impact of blasting in tunnel # 4 does not exceed the NAB (Threshold Value) of vibration for Class 1 SNI 7571: 2010, namely PVS = 3 mm / all frequency = 5-20 Hz. The impact of the blasting did not increase the value of the fracture in the community houses around tunnel # 4. From the results of data processing, the predicted values of Peak Vector Sum (PVS), Peak Particle Acceleration (PPA), Peak Particle Displacement (PPD) were obtained. With the equation PVS = 747.6 SD -1.48, PPA = 79.89 SD -1.64, PPD = 5.94 SD -1.6 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Pratama, Rengga
ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
description PT. SINOHYDRO together with PT. Kereta Cepat Indonesia Cina (KCIC) is currently working on the Jakarta-Bandung fast train tunnel construction project. One of the tunnels currently being worked on is tunnel # 4 in Sukatani District, Purwakarta Regency. Tunnel # 4 is planned to use mechanical excavation for soft materials in the form of silty clay and silty sand and blasting methods for hard materials in the form of andesite rock. This research was conducted with the aim of predicting the amount of PVS, PPA, and PPD as a result of the blasting in the vicinity of tunnel # 4 KCIC. Data was collected directly in the field using the Instantel "Minimate Plus" tool. Data processing was processed using the Blastware application and Microsoft Excel. The impact of blasting in tunnel # 4 does not exceed the NAB (Threshold Value) of vibration for Class 1 SNI 7571: 2010, namely PVS = 3 mm / all frequency = 5-20 Hz. The impact of the blasting did not increase the value of the fracture in the community houses around tunnel # 4. From the results of data processing, the predicted values of Peak Vector Sum (PVS), Peak Particle Acceleration (PPA), Peak Particle Displacement (PPD) were obtained. With the equation PVS = 747.6 SD -1.48, PPA = 79.89 SD -1.64, PPD = 5.94 SD -1.6
format Final Project
author Pratama, Rengga
author_facet Pratama, Rengga
author_sort Pratama, Rengga
title ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
title_short ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
title_full ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
title_fullStr ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
title_full_unstemmed ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
title_sort analysis of the impact of blasting tunnel # 4 on the jakarta-bandung fast train project on residence
url https://digilib.itb.ac.id/gdl/view/51665
_version_ 1822001021400907776