ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
PT. SINOHYDRO together with PT. Kereta Cepat Indonesia Cina (KCIC) is currently working on the Jakarta-Bandung fast train tunnel construction project. One of the tunnels currently being worked on is tunnel # 4 in Sukatani District, Purwakarta Regency. Tunnel # 4 is planned to use mechanical excav...
Saved in:
Main Author: | Pratama, Rengga |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51665 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF SLOPE STABILITY DUE TO BLASTING OPERATIONS FROM THE JAKARTA-BANDUNG FAST TRAIN TUNNEL NUMBER 4 WITH THE LIMIT EQUILIBRIUM METHOD
by: Jalaludin, Haris -
SLOPE STABILITY ANALISYS OF JOINTED ROCK DUE TO BLASTING OF THE 4TH TUNNEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
by: Aditya, Fariz -
TUNNEL STABILITY ANALYSIS ON WEAK ROCKS AT TUNNEL #4 KERETA CEPAT JAKARTA-BANDUNG CONSTRUCTION PROJECT
by: Anderson, Glenn -
SLOPE STABILITY ANALYSIS OF SOIL AND ROCK AROUND BOHONG MOUNTAIN, PADALARANG DUE TO BLASTING AT TUNNEL #11 HIGH-SPEED RAILWAY JAKARTA - BANDUNG
by: Dwifajar Prabowo, Jerry -
ANALYSIS OF VIBRATION EFFECT ON SURFACE BLASTING TOWARDS THE STABILITY OF TUNNEL # 4 THE INDONESIA-CHINA HIGH SPEED RAILWAY PROJECT, PURWAKARTA
by: Maulana, Yuga