INSPECTION INTERVAL DETERMINATION OF OFFSHORE STRUCTURE USING RISK RELIABILITY BASED UNDERWATER INSPECTION (RREBUI)
Inspection of the structure of offshore platforms in Indonesia has been using the TBI (time based inspection) system. However, periodic inspection of offshore platforms based on time has a weakness because it does not differentiate between the time and scope of the inspection to be carried out on...
Saved in:
Main Author: | Falahi, Fajrin |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51787 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REQUALIFICATION AND RISK BASED UNDERWATER INSPECTION (RBUI) PLANNING FOR AN OFFSHORE PLATFORM IN JAVA SEA
by: Gede Pradnyanata, Dewa -
LINEAR ANALYSIS OF SCOURING EFFECT TO THE STRENGTH OF OFFSHORE PLATFORM STRUCTURE
by: Kiesin, Willy -
SEISMIC RESPONSE COEFFICIENT FOR HIGH-RISE BUILDING DESIGN BASED ON PERFORMANCE AND RELIABILITY OF STRUCTURE
by: Muharzaki Putri, Wirza -
FATIGUE RELIABILITY BASED INSPECTION PLANNING OF JACKET OFFSHORE PLATFORM
by: HENDRA (NIM : 25004015); Pembimbing : Ir. Made Suarjana, Ph.D, CECEP -
RELIABILITY OF BALANCE CANTILEVER BRIDGE USING FRICTION TYPE BASE ISOLATOR
by: Cangjaya, Kevin