SLOPE STABILITY ANALYSIS OF SOIL AND ROCK AROUND BOHONG MOUNTAIN, PADALARANG DUE TO BLASTING AT TUNNEL #11 HIGH-SPEED RAILWAY JAKARTA - BANDUNG
Excavation for Tunnel # 11 of the Jakarta - Bandung High-Speed Railway using mechanical excavation methods for relatively weak rocks (Silty Clay and Gravelly Clay) and blasting methods for relatively hard rocks (Breccias and Andesites). The vibrations arising from this detonation will affect the...
Saved in:
Main Author: | Dwifajar Prabowo, Jerry |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51988 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SLOPE STABILITY ANALISYS OF JOINTED ROCK DUE TO BLASTING OF THE 4TH TUNNEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
by: Aditya, Fariz -
ANALYSIS OF VIBRATION EFFECT ON SURFACE BLASTING TOWARDS THE STABILITY OF TUNNEL # 4 THE INDONESIA-CHINA HIGH SPEED RAILWAY PROJECT, PURWAKARTA
by: Maulana, Yuga -
MODIFICATION OF BIAXIAL TESTS TO MEASURE THE DISPLACEMENT OF ROCK MASS AROUND SUPPORTED TUNNEL
by: Setiawan Anwar, Andy -
ANALYSIS OF SLOPE STABILITY DUE TO BLASTING OPERATIONS FROM THE JAKARTA-BANDUNG FAST TRAIN TUNNEL NUMBER 4 WITH THE LIMIT EQUILIBRIUM METHOD
by: Jalaludin, Haris -
ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
by: Pratama, Rengga