SLOPE STABILITY ANALYSIS OF SOIL AND ROCK AROUND BOHONG MOUNTAIN, PADALARANG DUE TO BLASTING AT TUNNEL #11 HIGH-SPEED RAILWAY JAKARTA - BANDUNG

Excavation for Tunnel # 11 of the Jakarta - Bandung High-Speed Railway using mechanical excavation methods for relatively weak rocks (Silty Clay and Gravelly Clay) and blasting methods for relatively hard rocks (Breccias and Andesites). The vibrations arising from this detonation will affect the...

Full description

Saved in:
Bibliographic Details
Main Author: Dwifajar Prabowo, Jerry
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51988
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first