UPAYA PENCAPAIAN PENYELESAIAN PROYEK TEPAT WAKTU PADA PROYEK PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN PROPINSI JAWA BARAT
<b></i> Abstract :</b><i> <p align=\"justify\"> <br /> Project schedule control is a part of project controlling with the purpose to keep the project on line in accordance with the project goal, that is the completion of the works on time according to t...
Saved in:
Main Author: | Hendrarto, Agus |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5201 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS PENERAPAN MANAJEMEN PROYEK UNTUK MENINGKATKAN KETEPATAN WAKTU PENYELESAIAN PROYEK
by: , Rony Kristianto Wibowo, ST, et al.
Published: (2012) -
Evaluasi harga proyek jalan dan jembatan dengan menggunakan model matematis
by: , HESKIA T., Benny, et al.
Published: (2004) -
Kompresi waktu penyelesaian proyek dengan analisis metode RPM pada proyek RS tipe 36 Perumahan Griya Mitra Karya Bandung
by: , MUJAHID, Shodik, et al.
Published: (2002) -
Analisis sistem jaringan kerja pada proyek pembangunan jembatan
by: , SARANGA, Hary Lebang, et al.
Published: (2001) -
Manajemen pemeliharaan jembatan :: Studi kasus bagian proyek pemeliharaan jembatan Provinsi Sulawesi Selatan
by: , HAMZAH, Nasjuadil, et al.
Published: (2004)