UPAYA PENCAPAIAN PENYELESAIAN PROYEK TEPAT WAKTU PADA PROYEK PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN PROPINSI JAWA BARAT

<b></i> Abstract :</b><i> <p align=\"justify\"> <br /> Project schedule control is a part of project controlling with the purpose to keep the project on line in accordance with the project goal, that is the completion of the works on time according to t...

Full description

Saved in:
Bibliographic Details
Main Author: Hendrarto, Agus
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/5201
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first