ANALISIS KEGAGALAN REBOILER 1114-CA PABRIK AMMONIA PT. PUPUK KUJANG CIKAMPEK
<b>Abstrack</b><p align=\"justify\"> <br /> During CO2 desorption from benfield solution, several tubes of reboiler were significantly thinning and leaking after about 6 years in service than estimated the technical design 20 years. The failure location at tubes at...
Saved in:
Main Author: | Hardjono, Priatmo |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/5313 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS KEGAGALAN REBOILER 1114-CA PABRIK AMMONIA PT. PUPUK KUJANG CIKAMPEK
by: Hardjono, Priatmo -
ANALYSIS OF OVERLOADING EFFECT ON JAKARTA - CIKAMPEK TOLL ROAD
by: Sedehananto -
KAJIAN ALTERNATIF PENDANAAN PROYEK JALAN TOL DENGAN PRIVATE FINANCING STUDI KASUS : PENDANAAN PT JASA MARGA (PERSERO) UNTUK RUAS JALAN TOL CIKAMPEK-PADALARANG (CIPULARANG)
by: Adrian Lubis, Arie -
PEMODELAN PABRIK UNTUK PENGELOLAAN LINI PRODUKSI
by: Santoso , Budi -
STUDI ESTIMASI LAJU KEGAGALAN PENYALURAN DAYA AKIBAT FLASHOVER PADA SALURAN TRANSMISI TEGANGAN TINGGI EKSTRA. (KASUS: SALURAN TRAUSMISI 500 KV SURALAYA - GANDUL)
by: Sabar Nainggolan , Werlin