INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
Indonesia is known as archipelago country and has a lot of volcanoes around its territory. The volcanoes bring Indonesia has a lot of geothermal resources. This geothermal resources can be utilized to fulfill the electricity demand by constructing geothermal power plant. In line with the vision of...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53525 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Indonesia is known as archipelago country and has a lot of volcanoes around its territory. The volcanoes
bring Indonesia has a lot of geothermal resources. This geothermal resources can be utilized to fulfill
the electricity demand by constructing geothermal power plant. In line with the vision of Indonesia’s
Government that set a target to supply its electricity using renewable energy sources by 23% in 2023,
the development of geothermal power plant is also helpful to reduce the carbon emission in Indonesia
which Indonesia has commit in Paris Agreement to reduce its carbon footprint.
This research discusses about financial feasibility study in developing 50 MW geothermal power plant
in Eastern. This research is analyzed using capital budgeting technique to see the financial feasibility of
the project.
The analysis result shows that the 50 MW geothermal power plant project in Eastern Indonesia is
financially feasible with its NPV is about USD 49 million or 10.3% IRR which larger than its WACC
of 8.12% and the LCOE of the project is 6.92 USD Cent/kWh. |
---|