INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA

Indonesia is known as archipelago country and has a lot of volcanoes around its territory. The volcanoes bring Indonesia has a lot of geothermal resources. This geothermal resources can be utilized to fulfill the electricity demand by constructing geothermal power plant. In line with the vision of...

Full description

Saved in:
Bibliographic Details
Main Author: Sihwan Abdullah, Muhammad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/53525
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:53525
spelling id-itb.:535252021-03-06T09:50:31ZINVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA Sihwan Abdullah, Muhammad Manajemen umum Indonesia Theses Feasibility Study, Geothermal, LCOE, INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/53525 Indonesia is known as archipelago country and has a lot of volcanoes around its territory. The volcanoes bring Indonesia has a lot of geothermal resources. This geothermal resources can be utilized to fulfill the electricity demand by constructing geothermal power plant. In line with the vision of Indonesia’s Government that set a target to supply its electricity using renewable energy sources by 23% in 2023, the development of geothermal power plant is also helpful to reduce the carbon emission in Indonesia which Indonesia has commit in Paris Agreement to reduce its carbon footprint. This research discusses about financial feasibility study in developing 50 MW geothermal power plant in Eastern. This research is analyzed using capital budgeting technique to see the financial feasibility of the project. The analysis result shows that the 50 MW geothermal power plant project in Eastern Indonesia is financially feasible with its NPV is about USD 49 million or 10.3% IRR which larger than its WACC of 8.12% and the LCOE of the project is 6.92 USD Cent/kWh. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Sihwan Abdullah, Muhammad
INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
description Indonesia is known as archipelago country and has a lot of volcanoes around its territory. The volcanoes bring Indonesia has a lot of geothermal resources. This geothermal resources can be utilized to fulfill the electricity demand by constructing geothermal power plant. In line with the vision of Indonesia’s Government that set a target to supply its electricity using renewable energy sources by 23% in 2023, the development of geothermal power plant is also helpful to reduce the carbon emission in Indonesia which Indonesia has commit in Paris Agreement to reduce its carbon footprint. This research discusses about financial feasibility study in developing 50 MW geothermal power plant in Eastern. This research is analyzed using capital budgeting technique to see the financial feasibility of the project. The analysis result shows that the 50 MW geothermal power plant project in Eastern Indonesia is financially feasible with its NPV is about USD 49 million or 10.3% IRR which larger than its WACC of 8.12% and the LCOE of the project is 6.92 USD Cent/kWh.
format Theses
author Sihwan Abdullah, Muhammad
author_facet Sihwan Abdullah, Muhammad
author_sort Sihwan Abdullah, Muhammad
title INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
title_short INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
title_full INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
title_fullStr INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
title_full_unstemmed INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
title_sort investment analysis of 50 mw geothermal power plant for independent power producer in eastern indonesia
url https://digilib.itb.ac.id/gdl/view/53525
_version_ 1822929352901263360