INTEGRATION OF GEOGRAPHIC INFORMATION SYSTEM MODELING IN DETERMINING THE PRIORITY DRILLING AREA OF THE SOUTHERN MOUNT KABA GEOTHERMAL FIELD, BENGKULU
Kepahiang geothermal field is planned to be operated in 2025 with an installed capacity of 110 MWe. Among the three main prospects comprised in this field, the Southern Mount Kaba prospect area is recommended to be first developed to achieve the power development plan considering it has a bigger hyp...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53540 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |