INTEGRATION OF GEOGRAPHIC INFORMATION SYSTEM MODELING IN DETERMINING THE PRIORITY DRILLING AREA OF THE SOUTHERN MOUNT KABA GEOTHERMAL FIELD, BENGKULU

Kepahiang geothermal field is planned to be operated in 2025 with an installed capacity of 110 MWe. Among the three main prospects comprised in this field, the Southern Mount Kaba prospect area is recommended to be first developed to achieve the power development plan considering it has a bigger hyp...

Full description

Saved in:
Bibliographic Details
Main Author: Deo Prambudi, Teguh
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/53540
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first