PENJADWALAN ULANG PRODUKSI FUSELAGE DAN TAIL UNIT PADA PESAWAT TIPE CN235 MENGGUNAKAN SKENARIO WAKTU KERJA
PT Dirgantara Indonesia (PT DI) is one of the State-Owned Enterprises (SOEs) engaged in the aeronautical industry. PT DI has several types of products ranging from aircraft to civilian, military, helicopter, and others. In addition to distributing finished units, PT DI also accepts orders in the for...
Saved in:
Main Author: | Fathul Islam, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53973 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SISTEM PENGAMANAN KOMUNIKASI UNTUK PESAWAT CN-235 MPA
by: Suryanata, Muhammad -
WORKER REQUIREMENT ANALYSIS OF CENTER FUSELAGE PANELIZATION SYSTEM IN CN-235 AIRCRAFT PT DIRGANTARA INDONESIA
by: AYU KUSUMA WARDANI, LINDA -
OPERATOR ASSIGNMENT DESIGN IN PANELIZED ASSEMBLY LINE OF CENTER FUSELAGE CN235 AT PT DIRGANTARA INDONESIA
by: Uli Agnes Monica Gultom, Shinta -
DAMAGE TOLERANCE ANALYSIS FOR MULTIPLE SITE DAMAGE LAP JOINT FUSELAGE CN 235 WITH PROBABILISTIC METHOD
by: EDY PRASETYO (NIM : 23607025); Pembimbing 1 : Prof. Dr. Ichsan Setya Putra; Pembimbing 2 : Dr, EKO -
THE PROPOSED DESIGN OF ASSEMBLY LINE TAIL UNIT CN235 AT PT DIRGANTARA INDONESIA
by: MELINDA SITORUS, GRACE