OPTIMIZATION OF NICKEL ORE EXCAVATION-LOADING AND TRANSPORTATION COSTS WITH THE CONSIDERATION OF MATCH FACTOR IN PT XYZ

PT XYZ Nickel North Maluku is one of the companies that has a Mining Operation/Production Permit from the government to carry out nickel mining operations in several locations, Pakal Island, Tanjung Buli, and Moronopo. Mining on Pakal Island has monthly production target around 150,000 tonnes. Mi...

Full description

Saved in:
Bibliographic Details
Main Author: Rizaldi Advianto, Ihsan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54401
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia