EFFECTIVE AND EFFICIENT CGS STRATEGY TO MITIGATE NDC UNPLANNED TOTAL SHUTDOWN: A CASE IN PT. CAPITAL PETROLEUM INDONESIA
Nowadays, the Duri POD (Plant Operations Duri) operates four Central Gathering Station (CGS) which receive produced fluids from producer wells, post workover wells, and new drilled well. Every CGS treats and distributes the soft water, good oil to customers, and sends the excess treated water, wa...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54710 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!