EFFECTIVE AND EFFICIENT CGS STRATEGY TO MITIGATE NDC UNPLANNED TOTAL SHUTDOWN: A CASE IN PT. CAPITAL PETROLEUM INDONESIA

Nowadays, the Duri POD (Plant Operations Duri) operates four Central Gathering Station (CGS) which receive produced fluids from producer wells, post workover wells, and new drilled well. Every CGS treats and distributes the soft water, good oil to customers, and sends the excess treated water, wa...

Full description

Saved in:
Bibliographic Details
Main Author: Susanto Pasaribu, Ade
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/54710
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items