EFFECTIVE AND EFFICIENT CGS STRATEGY TO MITIGATE NDC UNPLANNED TOTAL SHUTDOWN: A CASE IN PT. CAPITAL PETROLEUM INDONESIA
Nowadays, the Duri POD (Plant Operations Duri) operates four Central Gathering Station (CGS) which receive produced fluids from producer wells, post workover wells, and new drilled well. Every CGS treats and distributes the soft water, good oil to customers, and sends the excess treated water, wa...
Saved in:
Main Author: | Susanto Pasaribu, Ade |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54710 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REDUCE UNPLANNED SHUTDOWN ON SURFACE FACILITIES OF OIL AND GAS PLANT PROCESS â IN THE CASE OF PERTAMINA UPSTREAM OIL AND GAS BUSINESS
by: Rahmat Supriyadi, Yedi -
DECISION ANALYSIS TO AVOID UNPLANNED SHUTDOWN AND FATALITY FAILURE DUE TO SOUR CRUDE OIL PROCESSING IN CRUDE DISTILLATION UNIT (CDU) REFINERY UNIT VI BALONGAN
by: Karnosaputra, Yanto -
TECHNO ECONOMIC FEASIBILITY OF GEOTHERMAL POWER PLANT IN INDONESIA USING RETSCREEN CONSIDERING CARBON CREDIT MECHANISM TO ACHIEVE INDONESIAâS NDC 2060
by: Chrisantia Husein, Maura -
REDUCING UNPLANNED DOWNTIME FOR UREA PLANT-5 PT. PUPUK KALIMANTAN TIMUR
by: Dhyatmiko Arifianto, Rikho -
FAILURE MODES ANALYSIS TO MINIMIZE UNSCHEDULED SHUTDOWN OF AMMONIA 4 PLANT PT PUPUK KALIMANTAN TIMUR
by: Setiawan, Budi