A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG

For more than 90 years, PT. Energy Alam Mayang has been a leading producer of energy in Indonesia. Company seek to unlock Indonesia’s energy potential through innovation, providing new oil from oil fields. As common happened in the oil and gas industries, beside the oil produced, Company also produc...

Full description

Saved in:
Bibliographic Details
Main Author: Sidik, Muhamad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/54769
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54769
spelling id-itb.:547692021-06-02T08:33:05ZA PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG Sidik, Muhamad Manajemen umum Indonesia Theses Integrated Performance Management System, Project Performance Measure, Solid Hazardous Waste Utilization. ? INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54769 For more than 90 years, PT. Energy Alam Mayang has been a leading producer of energy in Indonesia. Company seek to unlock Indonesia’s energy potential through innovation, providing new oil from oil fields. As common happened in the oil and gas industries, beside the oil produced, Company also produce solid hazardous waste from its operations. Solid hazardous waste produced from contaminated soil. In order to minimize the impact to the environment, Company has solid hazardous waste utilization to red brick project. This project process thousands tons of solid hazardous waste processed to red brick product. The red brick utilization project execution managed by Company and supported by contractor. As part of process control, Company has Performance Management System (PMS) to measure the Company Organization and Contractor performance handling this project. Current performance measure implemented on the company project designed by functional basis. The performance measure are contract services performance, Health, Safety & Environment (HES) Performance and Quality Audit. Each performance measure assessment conducted by different organization and different assessment tool. The assessment schedule also has different timing. The current performance measure suspected has less effect to project performance improvement. Systematic assessment conducted to the current performance measure by using Integrated Performance Management System to identify the effective performance variables for performance measure. IPMS framework used to define the number of performance variables that support project deliverables. The validation of selected performance variables tested by signal detection theory to identify correct selection, gap, correct rejection and false alarm. There are 12 of performance variable identifies. 10 of 12 performance variable measure are identified as correct performance variable, 1 performance variable identifies as gap, and 2 performance variable identified as correct rejection. The ten of correct performance variables was defined as important for the long run project improvement and in the current performance measure they are effective for performance improvement. The selected performance variable weighted for the scoring system based on the respondent feedback statistic. Based on ten aspect comparison assessment, the proposed project performance measure provide more benefit to Company than current performance measure. The benefit obtained by having better performance measure tools that stimulate the project performance improvement that aligned with project deliverables objectives. The implementation plan of the project performance measure scheduled for 4 months with estimated budget of IDR.259MM. The implementation strategy developed to managed risk of implementation. Implementation strategy identifies milestone & constrains and mitigations. The success criteria of project performance measure are assessed by Right on target, validity, reliability, specificity, and acceptability. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Sidik, Muhamad
A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG
description For more than 90 years, PT. Energy Alam Mayang has been a leading producer of energy in Indonesia. Company seek to unlock Indonesia’s energy potential through innovation, providing new oil from oil fields. As common happened in the oil and gas industries, beside the oil produced, Company also produce solid hazardous waste from its operations. Solid hazardous waste produced from contaminated soil. In order to minimize the impact to the environment, Company has solid hazardous waste utilization to red brick project. This project process thousands tons of solid hazardous waste processed to red brick product. The red brick utilization project execution managed by Company and supported by contractor. As part of process control, Company has Performance Management System (PMS) to measure the Company Organization and Contractor performance handling this project. Current performance measure implemented on the company project designed by functional basis. The performance measure are contract services performance, Health, Safety & Environment (HES) Performance and Quality Audit. Each performance measure assessment conducted by different organization and different assessment tool. The assessment schedule also has different timing. The current performance measure suspected has less effect to project performance improvement. Systematic assessment conducted to the current performance measure by using Integrated Performance Management System to identify the effective performance variables for performance measure. IPMS framework used to define the number of performance variables that support project deliverables. The validation of selected performance variables tested by signal detection theory to identify correct selection, gap, correct rejection and false alarm. There are 12 of performance variable identifies. 10 of 12 performance variable measure are identified as correct performance variable, 1 performance variable identifies as gap, and 2 performance variable identified as correct rejection. The ten of correct performance variables was defined as important for the long run project improvement and in the current performance measure they are effective for performance improvement. The selected performance variable weighted for the scoring system based on the respondent feedback statistic. Based on ten aspect comparison assessment, the proposed project performance measure provide more benefit to Company than current performance measure. The benefit obtained by having better performance measure tools that stimulate the project performance improvement that aligned with project deliverables objectives. The implementation plan of the project performance measure scheduled for 4 months with estimated budget of IDR.259MM. The implementation strategy developed to managed risk of implementation. Implementation strategy identifies milestone & constrains and mitigations. The success criteria of project performance measure are assessed by Right on target, validity, reliability, specificity, and acceptability.
format Theses
author Sidik, Muhamad
author_facet Sidik, Muhamad
author_sort Sidik, Muhamad
title A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG
title_short A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG
title_full A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG
title_fullStr A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG
title_full_unstemmed A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY – PT. ENERGY ALAM MAYANG
title_sort proposed design of project performance measure for solid hazardous waste utilization project at oil and gas company – pt. energy alam mayang
url https://digilib.itb.ac.id/gdl/view/54769
_version_ 1822929715941343232