A PROPOSED DESIGN OF PROJECT PERFORMANCE MEASURE FOR SOLID HAZARDOUS WASTE UTILIZATION PROJECT AT OIL AND GAS COMPANY â PT. ENERGY ALAM MAYANG
For more than 90 years, PT. Energy Alam Mayang has been a leading producer of energy in Indonesia. Company seek to unlock Indonesia’s energy potential through innovation, providing new oil from oil fields. As common happened in the oil and gas industries, beside the oil produced, Company also produc...
Saved in:
Main Author: | Sidik, Muhamad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54769 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT ANALYSIS ON LIQUEFIED NATURAL GAS PROJECT (A CASE STUDY IN LNG COMPANY)
by: Erdian, Oldy -
IMPROVEMENT OF QUALITY ASSURANCE PROGRAM FOR PIPELINE REPAIR PROJECT IN OIL AND GAS COMPANY BY USING STATISTICAL QUALITY CONTROL AND SIX SIGMA
by: Aditia Buana Sucipto, Nur -
PROPOSED MARKETING STRATEGY FOR NAH PROJECT
by: Dhanu Sambodo, Priyo -
PROPOSED MARKETING STRATEGY FOR NAH PROJECT
by: Dhanu Sambodo, Priyo -
PROPOSED PROJECT MANAGEMENT SYSTEM FOR PT XYZ
by: Satiamulyana, Ardi