ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT THE BEST SERVICE CONTRACT MODEL IN MNS LABORATORY TO SUPPORT CEOR PROJECT
Resources support from the 3 rd party contractor is very critical in MNS Laboratory operation. The use of 3rd party to support laboratory activities is intended to optimize cost, maintain resources efficiency, and provide world class laboratory service. The contract model used will significantl...
Saved in:
Main Author: | Widiyanto, Adi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54775 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYTICAL HIERARCHY PROCESS (AHP) ANALYSIS TO SELECTING BEST CITY FOR OPENING OUTLET OF GRILLTO INDONESIA
by: Zeri Hardiansyah, Alvin -
DETERMINING THE BEST FIELD DEVELOPMENT SCENARIO USING ANALYTICAL HIERARCHY PROCESS (AHP): CASE STUDY OF SANDHIGH FIELD
by: Nugroho Ardhiansyah, Benny -
DETERMINING THE BEST SOLUTION TO OVERCOME CIRCULATION LOSS IN DRILLING PSJ STRUCTURES USING ANALYTICAL HIERARCHY PROCESS (AHP)
by: Luhur Pambudhi, Tri -
PROJECT CATEGORY PRIORITIZATION ANALYSIS IN PT HMI USING ANALYTIC HIERARCHY PROCESS (AHP)
by: Faris Fachrurrobbi Silmy, Ahmad -
THE APPLICATION OF ANALYTICAL HIERARCHY PROCESS (AHP) TO DETERMINE BEST COST EFFICIENCY PROGRAM : A CASE STUDY OF MAJAFRESHINDO GREEN FARM
by: Palguna Wijaya, Fajar