INVESTMENT EVALUATION OF LEASE PURCHASE FLOATING PRODUCTION UNIT PROJECT

ADM and HBM is well block under concession of PT. HCL, initially the block was planned to produce gas in 2019, which the design concept of production facility is using a floating production unit .These two blocks are estimated to contain 300 BCF natural gas and to be exploited 150 MMSCFD within 10 y...

Full description

Saved in:
Bibliographic Details
Main Author: Mudafi'ulhaq, Muhammad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/56003
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia