INVESTMENT EVALUATION OF LEASE PURCHASE FLOATING PRODUCTION UNIT PROJECT
ADM and HBM is well block under concession of PT. HCL, initially the block was planned to produce gas in 2019, which the design concept of production facility is using a floating production unit .These two blocks are estimated to contain 300 BCF natural gas and to be exploited 150 MMSCFD within 10 y...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/56003 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!