PROPOSED STRATEGY TO INCREASE PASSENGER MOVEMENT AND LOAD FACTOR IN KERTAJATI INTERNATIONAL AIRPORT (KIA)
Kertajati International Airport is an airport located in Majalengka, West Java. Currently, the Airport is experiencing complicated situations. Since its first operation, Kertajati airport has never met the load factor and has experienced low passenger movement. In 2019, the number of passenger mov...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57545 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Kertajati International Airport is an airport located in Majalengka, West Java. Currently, the Airport is
experiencing complicated situations. Since its first operation, Kertajati airport has never met the load factor
and has experienced low passenger movement. In 2019, the number of passenger movements had increased
quite significantly. However, when the COVID-19 pandemic occurred, KIA has continued to lose passenger
movement and is finally forced to stop serving regular flights in the middle of 2020. Based on the issues,
this research aims to analyze the issues and factors that might become the root causes and provide strategic
suggestions to airport authorities to address the low passenger movement and load factors problem. The
analysis will be carried out internally and externally. The internal analysis uses the VRIO, Marketing Mix,
and STP frameworks. External analysis will use the PESTLE framework, Consumer Analysis, and
Competitor Analysis. All internal and external analyzes will be concluded in a SWOT matrix which can
then be formulated into a strategy using a TOWS matrix. The research methodology will use a quantitative
method by distributing an online questionnaire randomly to determine the respondents' preferences for the
Airport Choice Factor in general and the specific choice factor from Kertajati Airport. Furthermore, it will
be known which airport choice factor is the most valued by the respondent. Moreover, Importance
performance analysis (IPA) will determine which factors are underperforming and which are performing.
Thus, the formulated strategy can be directly targeted to areas that are indeed underperforming. The results
are quite interesting where the three airport choice factors that respondents most valued are Airport Access
Time, Airport Accessibility, and Flight Schedule. Meanwhile, in terms of performance using the IPA
method, six out of ten airport choice factors underperform. These factors are Flight Schedule, Airport
Access Time, Airport Accessibility, Airline Availability, Airfares, and Flight Frequency. These six factors
possibly contributed significantly to the low passenger movement and load factors at Kertajati airport.
Furthermore, after conducting internal and external analyses, it can be formulated into strategies obtained
from the TOWS Matrix to address the low passenger movement problem. Several strategy formulations are
divided into three, which are adjusted to the target, namely the Central Government, Airlines and Airport
related service business, and Travelers or direct consumers. PT BIJB needs to carry out active
communication regarding the strategy to be implemented by the government, which involves many parties,
including several universities in West Java. For Airlines and Business Related, PT BIJB needs to coordinate
related strategies such as concessions and subsidies. To Travelers or End Consumers, KIA will use the
Integrated marketing communication method to address misinformation issues and rebuild the Airport's
positive brand image. In addition, KIA also needs to carry out active promotions to shift awareness into
travel intention. The strategy's implementation plan is planned for 16 months until 2023. Furthermore, the
phase starts from communication and coordination with the government, continues with coordination with
airlines and related businesses, and finally integrates marketing communication to address end consumers
until the end of the project. It is possible to extend the plan until 2024 or more, depending on the conditions
of the COVID-19 pandemic. The suggested strategy requires harmonious cooperation and integration
between PT BIJB, KIA, West Java, and Central Government and all relevant stakeholders to provide
maximum output.
|
---|