Export Ready — 

DESIGN OF FLOW PIPELINE IN GEOTHERMAL FIELD WITH WELLHEAD GENERATING UNIT TYPE

One of the reasons for the slowing growth of electricity from geothermal energy is due to the high initial costs and risks of developing power plants. Power generation system can be installed with central power plant or wellhead generating unit. The selection of the type of power generation system c...

全面介紹

Saved in:
書目詳細資料
主要作者: Valeska, Gian
格式: Final Project
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/57854
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia