DESIGN OF FLOW PIPELINE IN GEOTHERMAL FIELD WITH WELLHEAD GENERATING UNIT TYPE
One of the reasons for the slowing growth of electricity from geothermal energy is due to the high initial costs and risks of developing power plants. Power generation system can be installed with central power plant or wellhead generating unit. The selection of the type of power generation system c...
Saved in:
Main Author: | Valeska, Gian |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57854 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION OF PIPELINE DESIGN IN 2-PHASE GEOTHERMAL FIELD TO AVOID SLUG FLOW OCCURRENCE
by: Fatwa Putra, Maulana -
MACHINE LEARNING APPLICATION FOR PREDICTING MAXIMUM ALLOWABLE WELLHEAD OPERATING PRESSURE (MAWOP) IN âSâ FIELD
by: Salomo, Stephen -
EFFECT OF THE PIPELINE DIAMETER AND MASS FLOW ON CO2 PIPELINE TRANSPORT UNDER SUPERCRITICAL AND GASEOUS FLOW CONDITIONS
by: Eliezer Mileota, Christian -
EFFECT OF IMPURITIES ON CO2 PIPELINE TRANSPORT TO FIELD X
by: Fikri Zharfan, Muhammad -
PRODUCTION DECLINE ANALYSIS OF VAPOR DOMINATED RESERVOIR PATUHA GEOTHERMAL FIELD
by: Mediati Hapsari, Fasya