DESIGN OF FLOW PIPELINE IN GEOTHERMAL FIELD WITH WELLHEAD GENERATING UNIT TYPE

One of the reasons for the slowing growth of electricity from geothermal energy is due to the high initial costs and risks of developing power plants. Power generation system can be installed with central power plant or wellhead generating unit. The selection of the type of power generation system c...

Full description

Saved in:
Bibliographic Details
Main Author: Valeska, Gian
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/57854
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items