FRACIS TURBINE 2,5 MW DESIGN.STUDY CASE: KAMBANGAN MINI HYDRO POWER WITH HEAD 85M AND DISCHARGE 7 M\TEXTSUPERSCRIPT{3}/S.
Saved in:
Main Author: | Dewo, Gale |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59861 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FRANCIS TURBINE 1 MW DESIGN ON MINI HYDROPOWER KAMBANGAN WITH HEAD 87 M AND FLOW RATE 1,4 M\TEXTSUPERSCRIPT{3}/S.
by: Gieraldien Sahertian, Luthfie -
FRANCIS TURBINE 2 MW DESIGN WITH CASE STUDY KAMBANGAN MINI HYDRO POWER WITH HEAD 87 M AND DISCHARGE 2.8 M3/S
by: Danu Aditya Rachman, Rovky -
OPEN CHANNEL DESIGN ON MINI-HYDRO POWER PLANT (MHP) WITH DISCHARGE CAPASITY 7 M\TEXTSUPERSCRIPT{3}/S.
by: Bagus Novendianto, Ivan -
FRANCIS TURBINE 3 MW DESIGN WITH HEAD OF 87 M AND FLOW RATE OF 4.2 M\TEXTSUPERSCRIPT{3}/S .
by: Mahendra Pramono, Danur -
VISUALIZATION WATER FLOW ON MHPCASE STUDY : MINI-HYDRO POWER PLANT (MHP)KAMBANGAN 5 MW.
by: Rainday Ahmad, Yusnur