UTILIZATION OF LOW QUALITY STEAM WELL TO IMPROVE STEAM CAPACITY IN GEOTHERMAL POWERPLANT.
Saved in:
Main Author: | Armansyah Fauzi, Ahmad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60115 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu -
WELLBORE MODELLING OF A MULTI-LATERAL WELL FROM STEAM DOMINATED GEOTHERMAL FIELD
by: XAVERIUS GUWOWIJOYO - NIM : 22615306 , FRANSISCUS -
A THEORETICAL APPROACH IN DETERMINATION OF THE EFFECT OF WELL CONFIGURATION ON PRODUCTION DECLINE OF DRY STEAM GEOTHERMAL WELL
by: Adam Farizi, Safrian -
DESIGN OF GEOTHERMAL POWER PLANT UTILIZING EXCEES STEAM CASE STUDY PT INDONESIA POWER UBP KAMOJANG
by: MOCHAMAD IQBAL (NIM : 131 06 114); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, RIZA -
IMPROVEMENT OF STEAM PURITY GEOTHERMAL POWER PLANT WITH AIR COOLED HEAT EXCHANGER
by: Akbar Kharisma, Rafi