THERMODYNAMIC SIMULATION AND EFFICIENCY IMPROVEMENT OF COMBINE CYCLE BASED POWER PLANT SYSTEM
Saved in:
Main Author: | Vilaida, Xayalak |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60252 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Thermodynamic modelling of a combined-cycle fuel cell power plant
by: Hu, Bo.
Published: (2008) -
Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
by: RURIANDI (NIM : 13111072), HENDRASTANTYO -
ASSESSMENT OF ENERGY EFFICIENCY OF COMBINED CYCLE POWER PLANT (CASE STUDY: COMBINED CYCLE POWER PLANT IN PRIOK)
by: Ruriandi, Hendrastantyo -
AUDIT OF ENERGY EFFICIENCY OF COMBINED CYCLE POWER PLANT (CASE STUDY: COMBINED CYCLE POWER PLANT IN PRIOK).
by: Stenvil Woran, Hany -
THERMODYNAMIC ANALYSIS ON KALINA CYCLE MODIFICATION TO INCREASE CYCLE EFFICIENCY AND POWER PRODUCTION OF LOW-ENTHALPY GEOTHERMAL POWER PLANT
by: Muhammad Prakasa, Farhan