IMPROVEMENTS ON CAPACITY AND EFFICIENCY FOR TIRE PRODUCTION AT PT. XYZ
ABSTRACT: <br /> <br /> <br /> <br /> <br /> PT XYZ is a tire manufacturer with most of its products is export oriented. It turns out that the market demand is still bigger than the current daily production which can reach around 1,000-2,000 tires per day. The curr...
Saved in:
Main Author: | Wangsa (NIM 29105112), Fery |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/6112 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EFFECTIVENESS ANALYSIS OF PROCESS IMPROVEMENT METHODOLOGIES AT PT XYZ
by: Hasibuan (NIM 291 05 138), Cesar -
OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
by: PURNOMO (NIM : 29107149), EKO -
IMPROVING THE PERFORMANCE OF PT. XYZ THROUGH GAP ANALYSIS
by: KRISNA (29110010) Pembimbing: Dr. Ir. Yuni Ros Bangun, MBA, ARIANDA -
AN IMPROVEMENT PROPOSAL OF INVENTORY MANAGEMENT OF HAIR CARE CATEGORY IN PT. XYZ, TBK
by: KAUTSAR (NIM: 29107066), IKRA -
GEOLOGICAL DRILL CORE DATA PROCESS COMPLETENESS SYSTEM IMPROVEMENT, PT. XYZ
by: SETYADI (NIM: 29107126), HARMAN